Guangzhou Automobile Treasury Third Production Line Continuously Build Distributed Photovoltaic Project EPPhilippines Sugar daddy experience C General Contracting Project Tender Notice

作者:

分類:

requestId:68614926e25218.20300334.

The EPC contract for the third production line of this bidding project, Guangzhou Automobile Hongtian Automobile Co., Ltd., has been agreed by the Guangzhou Nansha Economic and Technology Development Zone Administrative Review and Approval Bureau (Editor: 2020-440115-44-03-022538) that the project owner is Guangzhou Development New Power Co., Ltd., and the construction funds are Xiaowei Sister on the Building. Your little sister scored 700 points in the college entrance examination. She is now from the company’s own funds and the bidding unit is Guangzhou Development New Power Co., Ltd. This project has the conditions for bidding, and public bidding is now made for the EPC general contracting of the project. The bidder who is welcomed will participate in the bid.

1. Project name: Guangzhou Automobile Non-Production Line Continued the EPC Contract for Distributed Photovoltaic Projects of the Third Production Line

Project number:

2. Tendering unit: Guangzhou Development New Power Co., Ltd.

Contact person: Hangzhou Gong Contact number: 020-3800341…2

Tendering representative organization: Gongcheng Governance Consulting Co., Ltd.Manila escort

Contact: Hu Gong/Chi Gong Tel: 153Sugar baby60593506

Sugar baby

Tender supervision agency: Guangzhou Development Group Co., Ltd.

Supervisor telephone: 020-37850924

III. Construction location and project overview:

Guangdong Automobile Third Production Line roof photovoltaic continuous construction project is located in the third production line of Guangzhou Guangzhou Guangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. 3 Coangdong Automobile No. The ground mount is 113.51° on the east tract and 22.84° on the north tract. This project is a continuous construction project. The total capacity of photovoltaic installation machine for the first phase is about 10MW, and it is built in pressing, welding, coating, overall installation, and resin car. The construction area of ​​this photovoltaic system in this period is a 5 new roof construction department and power station, in-depth processing station, GPS warehouse, waste station expansion, and component car room, with a total of 10 roofs. The number of components is calculated based on the 410Wp component model (the specific component model is based on the components supplied by the bidder). The total capacity of components is about 22,322 blocks, and the total capacity of the machine is about 9,152.02kWp. The project is published on the website of Manila escort.

4. Segmentation and the content and scale of each segment:

In the dream, Ye was forced to witness the entire book with his own eyes, and the content was mainly the heroine 1. This project plan is divided into 1 segment.

2. Tender content and scale:

Tender scope: This project is completed by the general contracting key delivery method. The bidding scope of this project is continuously built and newly built roofs from the third production line of Guangzhou Guangyuan Hongtian Automobile Co., Ltd., including the expansion of the overall car room, the expansion of the pressure car room, the expansion of the welding car room, the expansion of the coating car room, and the micro-min. I will not miss you. “The roof of the Sugar daddy is composed of a photovoltaic power station installed on the roof of the steel car, GPS warehouse roof, waste station roof, power station roof and deep treatment station roof. Important power and gas equipment in photovoltaic systems include: photovoltaic components, inverters, pressure boosters, distribution equipment and other facilities; important applications include photovoltaic component brackets, AC and DC power cables, and cables. Bridge frame and so on. The contract content includes but is not limited to all engineering designs, equipment data procurement and supply (excluding photovoltaic battery components), building installationPinay escortThe tasks of the entire process of engineering construction, project quality and construction period control, engineering governance, equipment supervision, training, adjustment, test, test until the acceptance and delivery of production, and the elimination of defects during the quality warranty period shall be met while meeting other responsibilities and obligations of the contract.

3. Planning period: Submit a construction report within 10 days of entry, and complete the design drawing review within 15 days after the contract is signed; pass it within six months from the date of formal construction and receive it online. The specific daily start-up date is based on the starting order issued by the chief supervisor engineer.

For specific requests, please see Chapter 5 of the bidding documents “Request by the contractor”.

5. Source of funds: Enterprise self-financing funds

6. Qualification request for bidders:

1. The bidder’s meaning of participating in bidders is clearly expressed, and the bidder’s representative is authorized to be useful.

2. The bidder is a legal person or other organization established in accordance with the law, and holds a legal person business license issued by the Political Management Department of the Industrial and Commercial Bank and operates in accordance with national laws.

3. The bidder must meet the following two qualification requests for A and B at the same time (if the bidder meets only one of the two qualification requests for A and B,A corresponding subcontract must be made for another business that does not meet the qualification requirements. The corresponding subcontractor must meet the request for quality that the person fails to meet. The original subcontract agreement signed with the subcontractor must be provided in the bid documents and the copy of the relevant qualification certificate that the subcontractor can meet the subcontractor’s request):

A: Design quality: Should be provided with the comprehensive A quality of engineering design. daddy, or engineering Sugar daddy designs the power industry’s B-level (inclusive) or engineering Sugar baby new power generation professional B-level quality.

B: Construction qualifications: Should be equipped with the third-level (inclusive) or above total contract for power engineering construction, and hold a safe production license for useful period issued by the construction administrative department.

[Required to be supplied to the bidder’s qualification certificate, the original subcontract agreement (if required), and the subcontractor’s qualification certificate (if required) that meet the above requests. ]

Note: The bidder cannot be a subcontractor of other bidders, and a unit cannot be a subcontractor of other bidders at the same time.

4. The bidder has up to 1 photovoltaic station EPC total contract engineering performance of a single capacity of 6 MW or more from January 1, 2017 to the daily deadline for the bidder. [Required to: ① Copy of the contract keyboard page, the contract keyboard page includes the contract homepage, the signing stamp page and important content page; ② The project has been certified online, and the project has been certified online and is limited to one of the following: National Electricity Supervision documents, power supply documents, project start handover signing and receipt books, handover certificates, investment certificates, and acceptance (completed) reports. ]

Note: If the performance provided to the Union is the performance of the Union, the bidder shall be the design party or the construction party and shall be provided to the Union Agreement for a copy. The business performance time is based on the network time.

5. The bidder has signed a bidder statement according to the content and pattern of Chapter 6 bid document layout 6.

6. The bidder does not have the following situation: the unit responsible person with other bidders is a unified person or may have a controlling or governance relationship (according to the bidder’s provisionThe content of the sixth article of the “Policy Statement” given by Sugar baby will be reviewed). If the applicant for the disagreement of the bid is a single person or may have a controlling or governance relationship, he/she will be under eligibility for review.

7. This bid will not accept joint bids.